Skip to content

Why the UAE

Infrastructure

Dubai is building a new terminal at Al Maktoum International for AED 128 billion. Etihad Rail started passenger trains in 2026 on its 900 km network. The Barakah nuclear plant supplies 25% of the UAE's electricity, and the median mobile download speed was 761 Mbps in September 2026.

Updated October 2026 · Figures checked 21 October 2026

AED, Al Maktoum International expansion
128bn1
AED, Al Maktoum International expansion
Etihad Rail network
900 km2
Etihad Rail network
Of UAE electricity from Barakah
25%6
Of UAE electricity from Barakah
Mbps, median mobile download, September 2026
7617
Mbps, median mobile download, September 2026

Infrastructure

Airports

Airports
Al Maktoum International (DWC), phase 2 Plan
Investment AED 128 billion, approved April 2024
First phase, within 10 years 150 million passengers a year
Ultimate capacity 260 million passengers and 12 million tonnes of cargo a year
Airfield Five runways and over 400 aircraft contact stands

Source: Dubai Airports: Dubai World Central, Al Maktoum International1

Rail

Etihad Rail's 900 km network links cities, ports and industrial areas from Ghuwaifat to Fujairah, with freight running through 11 terminals and four major ports.2

Rail
Passenger service Date
Abu Dhabi to Fujairah, 1 hour 45 minutes 30 June 2026
Abu Dhabi to Dubai and Al Dhaid 30 September 2026
Zayed City and Liwa 30 November 2026
Sharjah 30 March 2027

Source: Etihad Rail: Passenger network and launch dates; Etihad Rail: Passenger rail network unveiled3,4

Fares start from AED 39 in Comfort Class, and the Dubai station connects to the Dubai Metro at Jumeirah Golf Estates by a pedestrian bridge.5

Power

All four reactors at the Barakah nuclear plant in Abu Dhabi have run together since September 2024 and generate 25% of the UAE's electricity.6

Internet

Internet
Speedtest Global Index, September 2026 UAE
Mobile median download 761.17 Mbps, ranked 1st
Mobile median upload 48.01 Mbps
Fixed broadband Ranked 8th

Source: Ookla: Speedtest Global Index, United Arab Emirates (September 2026)7

Frequently Asked Questions

What infrastructure projects are under way in the UAE?

Dubai is expanding Al Maktoum International with a AED 128 billion terminal for up to 260 million passengers a year, and Etihad Rail began passenger services in 2026, with Sharjah due in March 2027. Barakah nuclear plant already supplies 25% of the UAE's electricity.

Infrastructure in detail

  • Rail

    Passenger trains, fares, freight and the Oman link.

    900 km National rail network, Ghuwaifat to Fujairah

    Read more
  • Roads and border crossings

    Salik and Darb tolls, and crossings to Oman and Saudi Arabia.

    10 Salik toll gates in Dubai

    Read more
  • Industrial zones

    KEZAD, Dubai Industrial City, land, warehouses and links.

    550 km² KEZAD economic zones, Abu Dhabi

    Read more

Sources

  1. Dubai Airports: Dubai World Central, Al Maktoum International
  2. Etihad Rail: The UAE's national rail project
  3. Etihad Rail: Passenger network and launch dates
  4. Etihad Rail: Passenger rail network unveiled
  5. Emirates News Agency (WAM): Etihad Rail's Dubai Station inaugurated (28 September 2026)
  6. Emirates News Agency (WAM): Barakah Plant delivers first year of full-fleet operations
  7. Ookla: Speedtest Global Index, United Arab Emirates (September 2026)

Figures checked 21 October 2026. Prepared by Invest-Emirates.ae for general information. It is not investment, tax or legal advice; please confirm details with a qualified adviser before acting.

Next step

Talk to People Who Do This Every Day

Business setup consultants, lawyers, accountants and recruiters who work with international investors, in the Invest-Emirates.ae directory.